Point Cook, Melbourne VIC
Complete Roof Restoration & Coating in Point Cook
Full roof restoration in Point Cook including tile high-pressure cleaning, flexible re-pointing, and UV protective painting.
Size
220 sqm roof
Time on site
Custom
Job type
Roof restoration
Crew lead
Sharif
Finished
How the job went
The roof tiles had faded over time, and cracked mortar pointing along the ridge capping was letting dampness seep through during heavy rains.
Sharif executed a full restoration: pressure-cleaning the entire roof surface, replacing broken tiles, re-bedding loose ridge caps, and applying flexible pointing compound. The roof was then finished with a protective primer and dual topcoats.
The work took two days, leaving the roof look brand new while protecting the tiles from Melbourne’s thermal expansion and UV exposure.

Full roof restoration in Point Cook including tile high-pressure cleaning, flexible re-pointing, and UV protective painting.